| Client:
|
Ministry of Public
Works & Housing |
| Location: |
Jordan |
| Services Provided: |
Supervision |
| Starting Date: |
7/1995 |
| Completion Date: |
4/1998 |
| Planning
Data: |
Length of Road=14.5
km
2Lanes/Direction
Total width = 21.8 m |
| Construction Cost: |
US $ 8,000,000 |
Construction of new road between Madaba and Umm Al-Amad at the Airport
Road (Yaadooda Bridge). Works include earthworks, construction of
pavement layers and median, construction of drainage structures
and lining of ditches, construction of retaining walls and safety
works (signs, road markings and guard rails) and the construction
of several at-grade intersections. Also the works include realignment
of utility services (water lines, electrical lines and telephone
lines).
|
|