| Client:
|
Water Authority of Jordan |
| Location: |
Mudawwara/Jordan |
| Services Provided: |
Design & Supervision
on construction |
| Starting Date: |
9/1990 |
| Completion Date: |
6/1993 |
| Planning
Data: |
-Sewers:
2770m
-Infiltration pond
80mx80m
-Pumping station
(No.2)10m3
/hr at
12m |
| Construction Cost: |
US $ 360,000 |
The purpose of this project which is located at the Jordan Saudi
Arabia border at a distance of 350 km from Amman is to construct
main sewers, house connections, sewage treatment facilities to improve
health conditions and reduce mosquitoes.
Services:
- Preliminary engineering design.
- Final detailed design.
- Preparation of tender documents.
- Construction Supervision.
|
|